H2-5k~12k 低压单相混合逆变器
产品描述
SAJ H2 5 – 12 kW Low-Voltage Hybrid Inverter (LS2)
Single-phase hybrid inverter for entry-level storage markets.
20 串联电流, 200 % DC oversizing and dual-MPPT architecture harvest more power while a built-in meter enables zero-export control. Up to four units can run in parallel, delivering seamless 20 ms UPS backup, generator charging and smart-load management – all in a compact 29 kg IP65 chassis.
设计
| 尺寸 | 590 × 380 × 241 mm |
| 重量 | 29 kg |
| 冷却 | 智能风扇 < 50 分贝 |
| 附件 | 铝制,IP 65 |
光伏及交流规格
| 额定交流功率 | 5 / 6 / 7.6 / 8 / 10 / 12 kW |
| 最大光伏发电量 | 10 – 24 kW DC (200 %) |
| MPPT 跟踪器 / 串联组 | 2 × 1 (90 – 480 V, 20 A ea.) |
| 网格输出 | L N PE, 220/230/240 V |
| UPS 备用电源 | 5 – 12 kVA, < 20 ms transfer |
| 最大效率 | 97.6 % |
| THD(电网) | < 3 % |
电池规格
| 化学 | 48 V Lead-acid or LiFePO4 |
| 电压范围 | 40 – 60 V |
| 最大充电/放电 | 100 A (5 – 8 kW) / 120 A (10 – 12 kW) |
| 往返 η | up to 96.6 % |
智能功能
- Self-Use, TOU, Backup & Generator/Smart-Load modes
- Built-in meter for zero-export & CT limit control
- Parallel up to 4 units on-grid or off-grid
- AFCI (optional) & rapid shutdown ready
- 蓝牙液晶屏 + Elekeeper 应用;Wi-Fi / 以太网 / 4G 云服务及 OTA 更新
安全与合规
- DC switch, Type II AC & DC SPDs, RCMU, GFCI & DCI
- 主动防孤岛、交流短路及过载保护
- Certified to EN 62109-1/2, AS 4777.2, VDE-AR-N 4105, CEI 0-21 and more
安装与服务
- Wall-mount bracket, terminal-block PV / AC / battery
- Smart-meter & CTs included; parallel & generator terminals onboard
- 通过Elekeeper应用在几分钟内完成佣金结算
- SAJ全球服务网络
保修
| 标准封面 | 5年 |
| 扩展选项 | 10年 |
产品视频展示
观看我们的产品演示和教程
SAJ H2 5-12k LS2 Open inside
视频加载失败
SAJ Next-Generation H2 LV Hybrid Inverter
视频加载失败
SAJ H2 5-12k LS2 Battery parameters setting
视频加载失败
SAJ H2 5-12k LS2 Grid standard setting
视频加载失败
SAJ H2 5-12k LS2 B3+H2LV installation
视频加载失败
SAJ在瑞典的精彩案例——2023年 - EN
视频加载失败
应用 场景
了解该产品如何 应用于各种实际场景
Urban Home Office: Quiet Backup for Work & Study
适用对象: Apartments or townhouses that need a silent backup for laptops, Wi-Fi, lights, and a fridge while working from home.
Suggested backup pack (example):
| 加载 | 功率 | Hours/day |
|---|---|---|
| LED lighting (2–4 rooms) | 120–200 W | 4–6 h |
| Wi-Fi router + CCTV | 25–45 W | 24 h |
| Laptop / small PC | 60–120 W | 6–10 h |
| 冰箱(变频型) | 平均90–150 W | 24 h (duty) |
3 quick steps:
- Move essential sockets to the 备份 sub-circuit; label clearly.
- Set a reserve SOC (e.g., 25–30%) so evening outages still have power.
- Run a 2-minute outage test; confirm seamless transfer and load order.
“Power blinked during a call—laptop and Wi-Fi stayed up. No interruption.” — Home worker feedback
Suburban House with TOU Tariffs: Cut Bills with Simple Scheduling
适用对象: Detached houses with 5–10 kW PV looking to shift energy from cheap night rates to the evening peak.
How savings happen (simple plan):
Charge (off-peak): 00:00–05:00 Daytime: PV → House; surplus → Battery Discharge (peak): 18:00–22:00 Reserve SOC: 25–30%
- 2 MPPTs handle east/west or south split roofs cleanly.
- Use the app to adjust times each season as daylight shifts.
- Keep heavy appliances (oven, large compressor) on non-backup.
| 组件 | 推荐 | 理由 |
|---|---|---|
| 光伏阵列 | 5–10 kW | 满足日间基础负荷需求 + 为电池充电 |
| Battery | 8–15 kWh | 2–4 h peak shaving |
| 模式 | Self-Use + TOU | Automated schedule; easy to tweak |
Small Retail / Clinic (Single-Phase): Keep Sales & IT Online
适用对象: Street-level shops, clinics, or cafés that run POS, lights, a small fridge, and basic IT—wanting steady service during short grid issues.
Recommended kit:
- PV 6–10 kW split across 2 MPPTs (east/west or south split)
- Battery 10–16 kWh for evening hours
- Backup branch: POS, lighting, router/CCTV, small freezer
Energy flow (typical day):
| Time block | Flow | 注 |
|---|---|---|
| 上午–下午 | 光伏 → 负载;富余电力 → 电池 | Covers base load while open |
| 傍晚 | Battery → POS, lights, IT | Smooth checkout during peak |
| 停电 | Seamless backup output | No reboot on POS/router |
Quick continuity checklist:
- Label backup vs non-backup circuits at the board.
- Keep high inrush appliances (big compressor, ovens) on non-backup.
- Run a 10-minute test with the site open; check card terminals and printers.
“Short brownout—POS never dropped, customers didn’t notice.” — Store owner
我们如何与您合作
从您首次致电到最终交付,我们确保整个流程简单明了
交流与规划
我们会倾听您的需求,并为您量身定制方案。我们的团队将帮助您了解所有可选方案。.
“引用并同意”
您将获得透明的价格,没有任何隐藏费用。一旦您对各项内容都满意,我们就签署协议并开始工作。.
制作与检查
我们会精心制作您的订单,并确保一切都符合我们的高标准。您将随时掌握订单的最新进展。.
配送与支持
您的订单将准时、安全地送达您手中。如果收货后有任何需要,我们随时为您提供帮助。.
常见问题解答
查找有关我们产品和服务的常见问题解答
How do I choose between 5k, 6k, 7.6k, 8k, 10k, and 12k for my site?
Quick idea: pick by daytime peak load + roof PV space; size battery by evening use hours.
| Site type | Peak load | Inverter | PV (typ.) | Battery (2–4 h) |
|---|---|---|---|---|
| Home + home office | 3–6 kW | 5–6 kW | 5–8 kW | 7–12 kWh |
| Villa / small shop | 6–10 kW | 7.6–10 kW | 8–12 kW | 10–20 kWh |
| Clinic / café with IT | 8–12 kW | 10–12 kW | 10–16 kW | 12–24 kWh |
Checklist before you lock size:
- List 5 critical loads you want alive in outages (backup branch).
- Count roof strings for 2 MPPT distribution; keep within 500 V DC max and current limits per model. :contentReference[oaicite:1]{index=1}
- Confirm local grid profile and breaker size (see FAQ 5 table).
What’s in the box, and which documents will I receive?
Typical package (by model):
| 项目 | Use |
|---|---|
| Hybrid inverter | PV + battery controller |
| 通信模块(Wi-Fi/4G) | App/portal connectivity |
| CT (external) | Metering & energy flow sensing |
| Terminal kit, battery temp sensor | Clean wiring / lead-acid temp comp. |
| Mounting hardware + hole template | Fast wall install |
| Documents pack | Quick Guide, User Manual, Warranty |
Sunriver Electric supplies the latest digital PDFs (datasheet, quick guide, user manual) on request to speed up approvals and site prep. :contentReference[oaicite:2]{index=2}
Before installation:
- Inspect carton for damage; verify exact model on the label.
- Lay out connectors separately to avoid cross-wiring.
- Read safety notes; install only by qualified electricians.
提示: keep the hole-positioning paper; it speeds drilling and keeps clearances correct for cable entry. :contentReference[oaicite:3]{index=3}
What batteries can I use, and how big should the pack be?
Battery types: LiFePO₄ or lead-acid, low voltage 40–60 V. Use BMS CAN/RS485 mapping for lithium; connect the temp sensor for lead-acid. :contentReference[oaicite:4]{index=4} :contentReference[oaicite:5]{index=5}
Simple sizing (examples):
| Use case | Evening load | Battery (kWh) |
|---|---|---|
| Home + fridge + IT | 1.5–2.5 kW × 3 h | 6–8 |
| Villa / small shop | 2–4 kW × 3–4 h | 10–16 |
| IT-heavy home office | 1–2 kW × 6 h | 8–12 |
Connection notes:
- Use the correct battery cable size (up to 0 AWG on 10 kW); torque to spec. :contentReference[oaicite:7]{index=7}
- Insert via BAT gland to BAT+/BAT− terminals; add isolator ≥70 A if required by local code. :contentReference[oaicite:8]{index=8}
- For lithium, wire BMS to BMS_CAN; for lead-acid, connect the temp sensor to COM1. :contentReference[oaicite:9]{index=9}
How does backup work, and what should go on the backup branch?
The inverter switches to battery and keeps critical loads running immediately and seamlessly during a grid outage. This avoids flicker or reboots on essential circuits. :contentReference[oaicite:10]{index=10}
Put on BACK-UP: LED lighting, router/CCTV, laptops/PCs, fridge (inverter type).
Keep on non-backup: EV charger, large ovens, big compressor motors (inrush current). :contentReference[oaicite:11]{index=11}
| 模式 | AC output (backup) | THDv |
|---|---|---|
| H2-5–12k LS2 | up to rated VA, 60 s peak headroom | <3% (linear load) |
Use the separate BACK-UP terminals shown in the junction box; label the backup sub-board clearly. :contentReference[oaicite:12]{index=12}
What AC breaker and cable sizes should I prepare (by model)?
Grid-side breaker & cable (from Quick Guide):
| 型号 | AC breaker | Cable size (L/N) |
|---|---|---|
| H2-5K-LS2 | 50 A | 8 AWG |
| H2-6K-LS2 | 63 A | 8 AWG |
| H2-7.6/8K-LS2 | 80 A | 8 AWG |
| H2-10K-LS2 | 100 A简体中文(大陆) | 6 AWG |
Notes:
- Keep total voltage drop ≤2% from point of grid connection; upsize cable if the run is long.
- Strip lengths: 20 mm for LOAD/GRID, 10 mm for GEN; torque to the listed values in the guide. :contentReference[oaicite:13]{index=13}
- Follow local codes for breaker curves and RCD selection.
How do I commission and monitor with the Elekeeper app?
- Download Elekeeper (iOS/Android). Choose language and Overseas Node; register if needed. :contentReference[oaicite:14]{index=14}
- Local connect via Bluetooth → select inverter SN → run the Initialization wizard. :contentReference[oaicite:15]{index=15}
- Set battery brand/mode, wiring (with/without meter/CT), and country/grid compliance profile. :contentReference[oaicite:16]{index=16}
- Join Wi-Fi/Ethernet/4G for remote monitoring; create the plant for the owner. :contentReference[oaicite:17]{index=17}
简易TOU电价表(示例):
Charge (off-peak): 00:00–05:00 Discharge (peak): 18:00–22:00 Reserve SOC: 25–30%
If Italy: run the built-in CEI 0-21 self-test and save the report from the app. :contentReference[oaicite:19]{index=19}
相关产品
发现您可能感兴趣的类似产品
准备好了解这款产品了吗?
请告诉我们您的需求——无论是价格、供货情况、技术规格还是项目规划。 我们的产品团队将在24小时内回复您。.
- 索取定制报价和交货期
- 获取工程支持和兼容性检查
- 获取产品资料和案例研究
谢谢!我们已收到您的咨询。.
我们的产品专家将在24小时内与您联系。一个详细的感谢页面已在新标签页中打开。.