Inversor híbrido monofásico de bajo voltaje H2-5k~12k
Technical Specifications at a Glance
| AC Power | 5kW - 12kW |
|---|---|
| Inverter Type | Inversor híbrido |
| MPP Voltage Range | 90 – 480 Volt |
| MPP Tracker | 2 |
| Phases | 1 |
| Communication | RS485, RS232, CAN, Wi-Fi, Ethernet, 4G |
| Pieces per Package | 1 per carton, 10 per pallet |
| Garantía | 5 years (extendable to 10 years) |
What This Model Is Best For
SAJ H2 5 – 12 kW Low-Voltage Hybrid Inverter (LS2)
Single-phase hybrid inverter for entry-level storage markets.
20 A string current, 200 % DC oversizing and dual-MPPT architecture harvest more power while a built-in meter enables zero-export control. Up to four units can run in parallel, delivering seamless 20 ms UPS backup, generator charging and smart-load management – all in a compact 29 kg IP65 chassis.
Design
| Size | 590 × 380 × 241 mm |
| Weight | 29 kg |
| Cooling | Intelligent fan < 50 dB |
| Enclosure | Aluminium, IP 65 |
PV & AC Specs
| Rated AC Power | 5 / 6 / 7.6 / 8 / 10 / 12 kW |
| Max PV Power | 10 – 24 kW DC (200 %) |
| MPPT Trackers / Strings | 2 × 1 (90 – 480 V, 20 A ea.) |
| Grid Output | L N PE, 220/230/240 V |
| UPS Backup | 5 – 12 kVA, < 20 ms transfer |
| Máxima eficiencia | 97.6 % |
| THD (grid) | < 3 % |
Battery Specs
| Chemistry | 48 V Lead-acid or LiFePO4 |
| Voltage Range | 40 – 60 V |
| Max Charge / Discharge | 100 A (5 – 8 kW) / 120 A (10 – 12 kW) |
| Round-trip η | up to 96.6 % |
Smart Functions
- Self-Use, TOU, Backup & Generator/Smart-Load modes
- Built-in meter for zero-export & CT limit control
- Parallel up to 4 units on-grid or off-grid
- AFCI (optional) & rapid shutdown ready
- Bluetooth LCD + Elekeeper app; Wi-Fi / Ethernet / 4G cloud & OTA updates
Safety & Compliance
- DC switch, Type II AC & DC SPDs, RCMU, GFCI & DCI
- Active anti-islanding, AC short-circuit & overload protection
- Certified to EN 62109-1/2, AS 4777.2, VDE-AR-N 4105, CEI 0-21 and more
Install & Service
- Wall-mount bracket, terminal-block PV / AC / battery
- Smart-meter & CTs included; parallel & generator terminals onboard
- Commission in minutes via Elekeeper app
- Global SAJ service network
Garantía
| Standard Cover | 5 years |
| Extension Options | 10 years |
Product Resources
Download the latest user manual & datasheet:
Installation, Walkthrough, and Product Videos
Use these videos for installation review, commissioning checks, and client-facing product walkthroughs.
SAJ H2 5-12k LS2 Open inside
Video failed to load
SAJ Next-Generation H2 LV Hybrid Inverter
Video failed to load
SAJ H2 5-12k LS2 Battery parameters setting
Video failed to load
SAJ H2 5-12k LS2 Grid standard setting
Video failed to load
SAJ H2 5-12k LS2 B3+H2LV installation
Video failed to load
SAJ's beautiful and stunning case reference in Sweden - 2023 - EN
Video failed to load
Where This Model Fits Best
Use these scenarios to decide whether this model belongs on the shortlist before quote approval.
Urban Home Office: Quiet Backup for Work & Study
Who it’s for: Apartments or townhouses that need a silent backup for laptops, Wi-Fi, lights, and a fridge while working from home.
Suggested backup pack (example):
| Load | Power | Hours/day |
|---|---|---|
| LED lighting (2–4 rooms) | 120–200 W | 4–6 h |
| Wi-Fi router + CCTV | 25–45 W | 24 h |
| Laptop / small PC | 60–120 W | 6–10 h |
| Fridge (inverter type) | 90–150 W avg | 24 h (duty) |
3 quick steps:
- Move essential sockets to the BACK-UP sub-circuit; label clearly.
- Set a reserve SOC (e.g., 25–30%) so evening outages still have power.
- Run a 2-minute outage test; confirm seamless transfer and load order.
Suburban House with TOU Tariffs: Cut Bills with Simple Scheduling
Who it’s for: Detached houses with 5–10 kW PV looking to shift energy from cheap night rates to the evening peak.
How savings happen (simple plan):
Charge (off-peak): 00:00–05:00 Daytime: PV → House; surplus → Battery Discharge (peak): 18:00–22:00 Reserve SOC: 25–30%
- 2 MPPTs handle east/west or south split roofs cleanly.
- Use the app to adjust times each season as daylight shifts.
- Keep heavy appliances (oven, large compressor) on non-backup.
| Component | Recommended | Reason |
|---|---|---|
| PV array | 5–10 kW | Covers daytime base load + charges battery |
| Battery | 8–15 kWh | 2–4 h peak shaving |
| Mode | Self-Use + TOU | Automated schedule; easy to tweak |
Small Retail / Clinic (Single-Phase): Keep Sales & IT Online
Who it’s for: Street-level shops, clinics, or cafés that run POS, lights, a small fridge, and basic IT—wanting steady service during short grid issues.
Recommended kit:
- PV 6–10 kW split across 2 MPPTs (east/west or south split)
- Battery 10–16 kWh for evening hours
- Backup branch: POS, lighting, router/CCTV, small freezer
Energy flow (typical day):
| Time block | Flow | Note |
|---|---|---|
| Morning–Afternoon | PV → Loads; surplus → Battery | Covers base load while open |
| Evening | Battery → POS, lights, IT | Smooth checkout during peak |
| Outage | Seamless backup output | No reboot on POS/router |
Quick continuity checklist:
- Label backup vs non-backup circuits at the board.
- Keep high inrush appliances (big compressor, ovens) on non-backup.
- Run a 10-minute test with the site open; check card terminals and printers.
What Buyers Get Before Quote Approval
From requirement check to document pack and quotation, Sunriver keeps the process clear for distributor and project teams.
Talk & Plan
We listen to your needs and create a plan that works for you. Our team will help you understand all your options.
Quote & Agree
You get a clear price with no hidden costs. Once you're happy with everything, we sign the agreement and start working.
Make & Check
We carefully make your order and check everything meets our high standards. You'll know exactly how things are going.
Ship & Support
Your order ships safely to you on time. We're always here to help if you need anything after delivery.
FAQ for Technical Review
Use these questions to resolve monitoring, warranty, compatibility, and procurement concerns before approval.
How do I choose between H1, H2, and H2 LV?
Start with phase, battery path, and backup scope. H1 is usually the single-phase starting point, H2 covers higher-output hybrid paths, and H2 LV is the better fit when low-voltage battery architecture is part of the decision.
What battery and backup details should be confirmed before approval?
Confirm battery voltage path, backup expectation, and whether the project needs zero-export or time-of-use control. Those three points usually determine whether the shortlist is technically safe before the commercial quote moves forward.
When should I ask for meter, accessory, or compatibility review?
Ask before internal approval when the system needs export control, smart metering, monitoring accessories, or battery matching. Compatibility questions are much cheaper to solve before the buyer locks the model list.
Which file should I open first for a hybrid project?
Use the datasheet to confirm phase, PV range, battery path, and backup basics. Move into the user manual or quick guide when the installer needs detailed wiring, commissioning, or operating-mode review.
What should I include in the request if I need pricing or model guidance?
Send the project type, phase, battery requirement, destination market, and expected quantity. If the buyer is comparing multiple backup strategies, include the critical load expectation so the model recommendation stays aligned with the use case.
Still have questions?
Can't find the answer you're looking for? Our support team is here to help you.
Compare Nearby Models
Review adjacent models before you finalize the shortlist.
Need Pricing, Documents, or Model Matching?
Tell us what you need—from pricing and availability to technical specs or project planning. Our product team will respond within 24 hours.
- Request pricing, lead time, and carton or pallet guidance
- Get engineering support and compatibility checks
- Receive datasheets, manuals, and project-reference material
¡Gracias! Hemos recibido tu consulta.
Our product specialists will reach out within 24 hours. A detailed Thank You page has opened in a new tab.